Energy, Power and Electrical

Clearing Power Grid Tender

📄 Tender ID: 528721753 📅 Published: 11 Feb 2026

📋 Tender Overview

This transmission line allows two-way electricity exchange with a maximum capacity of 1.5 million kW, expected to transmit about 3 billion kWh of electricity per year. Download The line has a total length of 177.5 km, connecting the 500 kV Nam Mo 3 substation in Oudomxay province (Laos) with the 500 kV Xishuangbanna substation in Jinghong city, Yunnan province (China - Photo: XinhuaLaos and China have completed the connection of the entire cross-border 500 kV power transmission line, marking an important step forward in energy cooperation between the two The line is expected to officially operate commercially in April 2026. According to Xinhua, the items in China and Laos of the 500 kV power grid connection project between China and Laos were officially technically connected on February 5, marking an important step in the roadmap to put the project into operation. The line has a total length of 177.5 km, connecting the 500 kV Nam Mo 3 substation in Oudomxay province (Laos) with the 500 kV Xishuangbanna transformer station in Jinghong city, Yunnan province (China). Of which, the 32.5 km long section on the Lao side is developed by the Lao National Electricity Transmission Company (EDL-T), starting in February 2025. This is the next key bilateral cooperation project between the two countries, after the success of the China - Laos railway. The project is located in a sensitive ecological area, including the habitat of Asian elephants. To solve this challenge, the project innovated by applying a helicopter transport model combined with large drones. This approach has helped transport more than 5,000 tons of supplies, reduce the forest clearance area by about 6.8 hectares and cut more than 90% of the construction impact on the reserve. In addition, an Asian elephant warning system was installed along the route, the team said. A team of specialized supervisors monitors the movement of elephants, thereby adjusting construction time and UAV flight paths, ensuring that construction activities do not conflict with the natural activities of wild animals. With the expansion of bilateral infrastructure connections to the energy sector, the project is expected to strengthen regional connectivity, promote optimization of energy structure and contribute to the sustainable development goals of both China and Laos. An Binh

🔍 Key Information

📄
Tender Reference No.
528721753
📅
Publication Date
11 Feb 2026
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 11 Feb 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A