📋 Tender Overview
Tainan Mayor Huang Weizhe attached great importance to the water quality of the Tainan Canal and asked the Water Resources Bureau to actively improve the water quality of the canal and seek funding from the central government. In order to improve the water quality of the canal the Water Conservancy Bureau continued to reduce the sources of pollution discharged into the canal through sewage and sewer user takeover and interception projects and continued to seek funding for sediment dredging and blind water exchange projects to improve the anaerobic environment at the bottom of the canal and the slow water flow rate. in order to create a friendly and sustainable ecological environment.In order to reduce the peoples livelihood sewage discharged into the canal the Water Conservancy Bureau has actively promoted the sewage sewer system since 1979. The total construction cost is about 13.54 billion yuan. At present the user takeover rate of the Anping Canal catchment area has reached 70. 5 interception stations around the canal and 34 rainwater tank culverts and side ditches interception facilities intercept peoples livelihood sewage and send it to the Anping Water Recycling Center for treatment. At present 90 of the pollution sources have been eliminated for the Anping Canal. From 1991 to 1998 the Water Conservancy Bureau removed about 400000 tons of sediment through the canal sediment dredging operation to prevent the sediment from odor.