📋 Tender Overview
The project covers a total area of 7000 square meters and a total construction area of 5000 square meters. It mainly builds a steel structure workshop. The main equipment purchased are precision coating machine drying silicone oil equipment water rewetting equipment slitting machine etc. The production process flow original film base paper entering the factory coating after corona treatment high temperature curing after preheating low temperature molding Cooling and shaping slitting and then entering the finished product warehouse leaving the factory. After the project is completed the annual water consumption is 4400 tons the annual power consumption is 119500 kWh and the annual comprehensive energy consumption is equivalent to 15.06 tons of standard coal. The company declares that the project complies with industrial policies and is responsible for the authenticity of the project filing information.