Infrastructure and construction Sports and leisure

China Cscec Builds Tender

📄 Tender ID: 463941286 📅 Published: 17 Jul 2021

📋 Tender Overview

On June 28 a large-scale epic show the great journey which is presented on the huge stage built by CSCEC was grandly held at the National Stadium.To turn the Birds Nest into the worlds largest immersive theater in just two months the project is huge in size strong in professionalism short in construction period and has many cross operations. The project team has faced difficulties and challenges because they had to organize and coordinate the simultaneous construction of various jobs such as stage construction lighting sound big screen and wire.In order to ensure the quality of the project managers of CSCEC with many experiences in serving large-scale celebrations were organized to form a project team. More than 300 construction teams dozens of cranes and other equipment and more than 10 material suppliers were organized to guarantee the smooth progress of the project.According to the design requirements the whole stage is 200 meters long and 100 meters deep. Three square lifting stages with a height of 3 to 5 meters are in the front area a 174-meter-long big screen should be set up inside in the center of the stage so that the Birds Nest can be transformed into the largest immersive theater in the world and in order to capture high-altitude shots 12-meter-long rocker arms which can rise to a height of 10 meters are installed on both sides of the stage.The project team built a stage main screen frame with a total length of 174 meters a width of 15 meters and a height of 39 meters two auxiliary screen frames with a length of 65 meters and a height of 10.5 to 23.5 meters and a reversible auxiliary screen frame with a length of 32 meters a width of 8.4 meters and a height of 9 to 18 meters in the middle. Over 100000 cubic meters of scaffolding 2000 tons of counterweight hoisting and 1500 tons of steel structure installation are used for the installation of 8000 screens.On the basis of scientific investigation engineers of CSCEC have applied BIM technology established a three-dimensional model and optimized the arrangement of components. By designing reinforced concrete foundation at the lower part of steel structure the load of the frame on the ground is reduced to less than 10t which met the bearing capacity requirements of the ground in the central site of Birds Nest. In order to meet the requirements of large props on the stage the project team doubled the carrying capacity of the stage from 500kg to 1t.In the whole process CSCEC strengthened technical research and fully served the needs of the director group. It took only 50 days and nights to successfully complete stage which was 10 days ahead of schedule.

🔍 Key Information

📄
Tender Reference No.
463941286
📅
Publication Date
17 Jul 2021
🌐
Sector
Infrastructure and construction
📝
Notice Type
News
📍
Location
China

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 17 Jul 2021
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country China
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…