📋 Tender Overview
Central Power Corporation (EVNCPC) has just issued an urgent power, requiring member units and representatives of the capital at joint stock company to urgently implement the plan to respond and overcome the consequences of natural disasters due to storm No. 5 (Kajiki). Mr. Nguyen Huu Khanh, Deputy General Director of Central Power Corporation, chaired an online meeting with member units on storm response. Especially in the Central region from Quang Tri back, the area managed by EVNCPC and is forecasted to be directly affected by the storm, the units must temporarily suspend the necessary activities, organize the duty of the Board of 24/24 hours, strengthen the testing, the overseaver, the overseavering, the overseaver, the overseaver, the relevant and the overseaver on Electricity, operation control of the factory and hydroelectric dam, ensuring absolute safety for works, equipment and people. When a natural disaster failure occurs, it is necessary to quickly handle, prioritize the electricity restoration for important loads and natural disaster prevention works, absolutely do not close again when not fully check the safety conditions of the scene. Quang Tri returned to the storm that is expected to directly affect. Must ensure the safety of the electricity system, for the operating force and the people .EVNCPC also requires the project management units to review the construction site, monitor the storm movement to ensure safety for people and equipment. Hydropower operators must comply with the process and strictly implement the direction of the local Steering Committee on the regulation of reservoirs. For units affected, damage caused by natural disasters, it is necessary to update the situation on SMIS software before 6:30, 12:30 and 18:30 daily, and promptly report to the EVNCPCCTTTTTTTTTTTTC are prescribed. At the same time, the units are ready to cut off electricity in flooded areas and rising water to ensure safety of operating the grid. The company requires units to increase inspection at crucial points, areas at risk of landslides, flooding or easily divided when floods. The high -voltage grid enterprise is also ready to re -arrange the duty at 110 kV transformer stations. In addition, the units have prepared adequate food, drink, medicine, vehicles, supplies and preventive equipment such as generators, motorboats, fuel ... to promptly respond to incidents. After the storm, the units must urgently tally and statistics damage, and at the same time implement the fastest plan to restore the grid, ensure electricity safety for the people when the power supply returns. Natham more examining more references to refer to more references