📋 Tender Overview
The work will be carried out from June 1 to 3 and will require temporary restrictions on vehicular traffic.The Ministry of Transportation and Communications, through Provias Nacional, will carry out work to improve the slab of the Tamboraque III bridge, located at km 90 of the Central Highway, from June 1 to 3, with the aim of strengthening safety and guaranteeing better passability conditions on this important national highway.
To ensure the safe development of the work and protect both workers and road users, a temporary restriction on vehicular traffic will be applied. During the intervention days, scheduled passes will be enabled every two hours for a period of one hour, between 12:00 a.m. and 5:00 p.m. m. and 9:00 p.m. m.
The works will optimize the operating conditions of the structure, prolong its useful life and contribute to safer and more efficient circulation for thousands of users who travel through this road corridor daily.
Provias Nacional urges drivers to respect the installed signage and the instructions of the personnel in charge, in order to avoid setbacks and guarantee the proper development of the work.