📋 Tender Overview
Twelve vehicles will enter into operability once they have a filming plate and registration. Second phase of the project will be the elaboration of the technical file for the landfillThe Provincial Municipality of Coronel Portillo has received all of its new fleet of solid waste compactor vehicles, a crucial step in the project of Improvement and expansion of the public cleaning service in the districts of Calleria, Manantay, Nueva Requena and Yarinacocha of the province of Colonel Portillo. Delivery includes 7 compactors of 15 m3 and 5 of 21 m3, in total they total 12 vehicles that will significantly strengthen the capacity for garbage collection in the district of Callery.
This important advance is possible thanks to the cooperation of the German Bank KFW, channeled through the Ministry of Environment (Minam). The provincial mayor of Coronel Portillo, Janet Castagne, expressed her gratitude to the representatives of both entities during the delivery and recalled that with both entities have worked hand in hand so that this project can begin and the results are being seen.
At the same time, he emphasized the commitment of his management with the cleaning of the city, highlighting that, in addition to the investment in infrastructure, the program Cleaning Command has been implemented, for each process from the collection, sweeping, segregation, education and the Anti -chin Battalion that will be present in each corner with the inspectors, serene and volunteers to guarantee good customs, avoiding trash to pass the vehicles or from the vehicles. affirmed.
Cooperative
Dominik Arnold, portfolio manager of the German Development Bank KFW, referred during his visit that a stage of this project is concluding with the delivery of solid waste containers. We are here to check that vehicles were already delivered and also discuss the progress of the program in general, because it is not only about vehicles, but also infrastructure and integral management of solid waste.
He also called, for the population to join this purpose of keeping the city clean and healthy. Pucallpa is very pretty and I also deserve to stay clean and, I think that also requires an effort of all citizens.
The German cooperation representative said that the consulting phase that will develop the detailed designs of the infrastructure that will be implemented for the landfill, an valorization plant, a composting plant is also starting, a composting plant also and, based on this the infrastructure will be built.
Comprehensive impact on waste management
The public cleaning improvement project is not only limited to waste collection, but also covers the construction of key infrastructure for comprehensive and sustainable management:
Therefore, the following phase of the project includes the construction of the landfill, designed to effectively control liquid and gaseous emissions. It will feature waterproofing systems, leachate drainage and devices for gas control, thus minimizing risks to public health and preventing environmental degradation by reducing soil and water pollution, and preventing toxic substances from reaching nearby water sources.
Additionally, the construction of a conditioning area and an organic and inorganic waste valuation plant is projected. These facilities will allow solid waste separation and processing to recover recyclable materials (such as plastics, metals, glass and paper) and reusable products. Likewise, composting will occur for the improvement of degraded soils, promoting the circular economy and the use of resources.
The Provincial Municipality of Coronel Portillo reiterates its commitment to the well -being of its citizens and the care of the environment, marking a milestone in the modernization of public cleaning services in the region.