📋 Tender Overview
The population of Santa Catarina now has easier access to the states coast the bridge over the Cambori River on the south side of the BR-101SC. The new bridge was built with the aim of ensuring traffic flow and more safety on the road also boosting tourism in the Balnerio Cambori region.The work connects the waterfront and the access to two important neighborhoods of the city Vila Real and Nova Esperana previously considered a bottleneck in the urban stretch of the municipality of Balnerio Cambori. The bridge has fundamental importance for the mobility of the region and for access to the Events Center said the Minister of Infrastructure Marcelo Sampaio.The investment in the work was R 11.6 million whose execution took 17 months. The bridge is 172.7 meters long by 10.4 meters wide has two lanes and a shared walkway segmented for pedestrians and cyclists.