📋 Tender Overview
The recomposition of the public budget in 2023 by the Federal Government will allow the resumption of the maintenance of 116 kilometers of the BR-364/AC, the only land connection between the capital of Acre, Rio Branco, and the city of Cruzeiro do Sul (AC), which today it is in poor condition. This Tuesday (30), the Minister of Transport, Renan Filho, signed two service orders authorizing the conservation works of two sections of the highway.
With the signature, the works between the Gregório river and the Liberdade river (km 620.9 to km 682.9), in plot 7, and between the Branco river and the Andirá river (km 125 to km 179), are guaranteed. in lot 2. In total, R$ 174.9 million are planned for maintenance and conservation, which will be carried out by the Ministry of Transport, through teams from the National Department of Transport Infrastructure (DNIT).
In lot 7, the services will take place along 62 kilometers, with actions to cover holes, mowing, improvements in signaling, cleaning, clearing of drainage devices, among others. The works will directly benefit the population of surrounding cities such as Cruzeiro do Sul, Rodrigues Alves and Mâncio Lima. In lot 2, the improvements total 54 kilometers in length.
“We are going to change the reality of this highway, which was in a poor state of conservation due to the lack of public investment. The resumption of maintenance and conservation will generate jobs, income and provide road safety for all the thousands of people who travel through the two lots”, said the Minister of Transport, shortly after the signing of the two service orders.
Budget
For 2023, the Ministry of Transport has forecast R$ 293.3 million to be invested in maintenance works and expansion of capacity on the federal highways that cross Acre. The amount is almost 3.5 times greater than the total paid in 2022 by the previous management – ??R$ 85.2 million. This increase was only possible with the approval, at the end of last year, of Constitutional Amendment 126/2022, which allocated BRL 18.5 billion to the Ministry of Transport, in addition to an additional BRL 1.7 billion in outstanding payments. .
One of the largest highways in the interior of Brazil, the BR-364 connects São Paulo to Acre along its more than 4,200 km. Named Marechal Rondon Highway, it leaves the city of Cordeirópolis in São Paulo and crosses the states of Minas Gerais, Goiás, Mato Grosso, Rondônia until it reaches the municipality of Mâncio Lima in Acre. Products from livestock, family farming and wood extraction through forest management pass along the road.