📋 Tender Overview
Provias Nacional carries out infrastructure interventions to guarantee safe passability on route PE-22, which connects Lima and La Oroya.The Ministry of Transportation and Communications (MTC), through its executing unit Provias Nacional (PVN), began maintenance work on the Eduardo de Habich, Tamboraque III and Palomar bridges, located in the Lima-La Oroya corridor of the Central Highway (national route PE-22).
These preventive interventions are part of the actions aimed at strengthening road safety and ensuring the adequate passability of a strategic route for the transportation of passengers and goods at the national level.
The work on the Eduardo de Habich bridge includes the replacement of hangers, which are tensioned steel cables; repair of slabs, change of longitudinal stops, elements that control the movement of the deck and the absorption of impact and derivatives of vehicular braking, and the installation of special support devices, as well as structural adjustments that will allow optimizing the performance of these infrastructures.
Likewise, specific work will be carried out on the Tamboraque III bridge, which has a metal structure and is 45 meters long. Also on the Palomar bridge, 23 meters long, built with reinforced concrete beams.
During the execution of the works on the three bridges, with a schedule scheduled for approximately 48 days, traffic control and management measures will be implemented to minimize restrictions and avoid greater impacts on the movement of private vehicles, transportation of personnel, cargo and public services.
The MTC reaffirms its commitment to permanently monitor the state of the road infrastructure and to adopt the necessary actions to guarantee safe driving conditions on the Central Highway, in coordination with competent entities.