Environment and Pollution

Bahrain Artemis Moon Tender

πŸ“„ Tender ID: 477718229 πŸ“… Published: 06 Sep 2022

πŸ“‹ Tender Overview

The launch of Nasas new Artemis I Moon rocket is facing a potentially lengthy delay after a second postponement.Controllers tried and failed again on Saturday to get the Space Launch System SLS vehicle to lift off. They were thwarted by a fuel leak.Engineers now want to inspect the rocket and any repairs may need to happen in the workshop rather than on the launch pad.The whole process is certain to lead to a setback of several weeks.It means we may not see a third launch attempt before mid-October at the earliest.The SLS is the most powerful rocket ever developed by the US space agency and is designed to send astronauts and their equipment back to the Moon after an absence of 50 years.Much of the enormous thrust comes from burning almost three million litres of super-cold liquid hydrogen and oxygen in four big engines on the vehicles underside.But when controllers sent the command early on Saturday morning to fill the rockets hydrogen tank an alarm went off indicating there was a leak.The problem was traced to the connection where the hydrogen was being pumped into the vehicle.Controllers tried a number of fixes including allowing the hardware to warm up for short periods to reset the seal but they were not successful.The Artemis I mission is uncrewed but Nasas Artemis mission manager Mike Sarafin said the rockets future role in human spaceflight meant extreme care was still required in its operation.This is an incredibly hard business. This is an initial test flight of this vehicle. As was said were going to fly when were ready. And as part of this initial test flight were learning the vehicle were learning how to operate the vehicle he told reporters. His boss Nasa Administrator Bill Nelson agreed I look at this as a part of our space programme of which safety is the top of the list.The leaky seal on the SLS could conceivably be fixed on the launch pad. But there are batteries in the termination system used to destroy the rocket in the event of a wayward launch that will require recertification beyond this coming week and this can only be done in the workshop.Rolling the vehicle back to the engineering building makes a third lift-off attempt before mid-October unlikely.In order to test our batteries change out the batteries we have to roll back said Jim Free Nasas associate administrator for exploration systems development.Saturdays attempt to despatch the SLS rocket had been scheduled for the start of a two-hour window beginning at 1417 local time 1917 BST 1817 GMT.The 100m-tall vehicles objective is to hurl a human-rated capsule called Orion in the direction of the Moon something that hasnt happened since Project Apollo ended in 1972.

πŸ” Key Information

πŸ“„
Tender Reference No.
477718229
πŸ“…
Publication Date
06 Sep 2022
🌐
Sector
Environment and Pollution
πŸ“
Notice Type
News
πŸ“
Location
Bahrain

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
0
days remaining Β· 06 Sep 2022
πŸ”” Set Alert

🧭 Quick Facts

Authority N/A
Country Bahrain
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…