📋 Tender Overview
The Majes Siguas - Autodema Special Comprehensive Project held a working meeting with representatives of the Chinini-Huambo User Commission, in which the institutional commitment to carry out protection and evaluation actions in the major infrastructure of channel 27, located in the Fahuana ravine, in the Chinini countryside, was reaffirmed.
The delegation of farmers was received by the executive manager of PEIMS-AUTODEMA, Eng. Duberly Otazu Garcia, and was headed by the president of the Chinini-Huambo Users Commission, Mr. Gregorio Caceres Osorio. During the meeting, the current situation of channel 27 and other associated hydraulic infrastructures was addressed, with the aim of guaranteeing its adequate operability and safety.
As a result of the technical dialogue, the following agreements were established:
In POMDHI 2026, Autodema will prioritize the execution of the project called: Protection of slopes on both banks, upstream and downstream of the Chinini stream, crossing channel 27, district of Huambo, province of Caylloma, department of Arequipa.
Autodema will carry out a technical evaluation visit to the affected infrastructure of the Llahuirca Uncapampa canal and to the collection chamber (Uncapampa valve), in order to verify the existing damages and define the corresponding actions.
During the next water cut of the Majes canal, Autodema will schedule a technical visit to the infrastructure located at the base of the canal 27 aqueduct, with the participation of the Chinini-Huambo User Commission.
Finally, Autodema reiterated that it will maintain constant and permanent communication with the users of the hydraulic system, not only in the Chinini-Huambo sector, but in all the districts within the scope of influence of the Majes Siguas Project, reaffirming its commitment to water security and the sustainability of the major infrastructure.