Energy, Power and Electrical

Austria Wiener Netze Tender

📄 Tender ID: 512844539 📅 Published: 08 Jan 2025

📋 Tender Overview

The growing city, more businesses and trades, in short, more electricity demand make it necessary to build new substations and expand existing facilities. With a budget of 12 million euros, Wiener Netze is currently expanding the Aspern substation with a new medium-voltage system and an additional transformer.

"Vienna is constantly growing and at the same time boasts a high quality of life that is widely recognized internationally. A secure power supply is an absolute priority here," stresses Peter Hanke, City Councilor for Finance, Economics and Vienna Public Utilities, during the on-site inspection in Aspern. "In addition, a geothermal plant was built nearby that is important for Vienna's energy future and also requires a strong power grid to function smoothly," explains Hanke.

Power grid expansion important for grid stability
"The expansion of the substation is necessary so that we can continue to supply all customers in Vienna and the surrounding area with electricity safely and reliably in the future," explains Wiener Netze Managing Director Thomas Maderbacher. "The new, modern 20 kV medium-voltage system ensures an efficient and low-maintenance energy supply. New protective devices and a digital control system also increase grid stability and help us to identify and resolve faults more quickly. We are constantly working to maintain our uniquely high supply security of 99.99 percent," says Maderbacher.

New plant will start operations in 2026
The shell of the new switchgear began in autumn 2024. The three-story building with a green roof and photovoltaic system is scheduled to be completed by summer 2025. The system will then be installed. The system is scheduled to go into operation in summer 2026. In the future, the Aspern substation will therefore consist of a 110 kV switchgear, a new 20 kV switchgear and three transformers. It is connected to the Stadlau and Essling substations when fully operational.

Substations ensure efficient energy transport
In total, Wiener Netze operates 47 substations and over 11,000 transformer stations in its supply area and offers one of the safest power grids in the world. In order to transport energy from A to B in an electrical supply network at high voltage and with little loss, high voltage is converted to medium voltage in a substation. In turn, medium voltage is converted to the low voltage required for one or more households in transformer stations.

🔍 Key Information

📄
Tender Reference No.
512844539
📅
Publication Date
08 Jan 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Austria

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 08 Jan 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Austria
State / UT N/A
Tender Type Procurement News
Currency Vijay98
Similar Tenders
Loading similar tenders…