Bridges and Tunnels Railways

Austria Nocturnal Masterpiece Tender

📄 Tender ID: 448829398 📅 Published: 14 Nov 2019

📋 Tender Overview

After the smooth transfer of the bridge over the Breitenfurter Strae the night before the steel colossus was moved over the seven tracks of the southern runway during the night from 9 to 10 November. The impressive bridge excavation is part of an OBB project during which the bridges of the Donaulande Railway which arrived at the end of their service life are replaced by new structures over the Meidlinger recess. Coming from the direction of Graz the last section in front of the Wien Meidling station runs in an area cut. In this so-called Meidlinger recess the southern route - one of the most important connections in the entire OBB network - runs from Vienna to Graz Klagenfurt. The Donaulandebahn an important freight transport connection in Vienna crosses the southern section of the Meidlinger section before continuing to Inzersdorf.Since the railway bridges of the Donaulande railway which date back to the 1950s no longer meet the requirements of todays Meidlinger cutting they are being replaced by new structures. A particular challenge of this project is the construction of a new steel arch bridge over the southern section without having the least impact on one of the busiest sections of the entire BB network. Therefore the entire steel arch bridge with a span of 58.60 m since May 2019 was erected on a pre-assembly site next to the Donaulandebahn. On the night of 8 to 9 November she was pushed over the Breitenfurter Strae from 9 to 10 November finally on the 7 tracks of the Stdstrecke.Other aspects of the projectIn addition to the steel arch bridge over the southern section the concrete bridge over the Breitenfurter Strae will also be rebuilt. In addition two pedestrian footbridges will be renewed the previously unmitigbar guided next to the existing bridges Grieersteg is connected as Kragarmkonstruktion with the new bridge. Due to the higher ramps of the new bridges and the Belghofersteg northwest of the Meidlinger incision in a staggered position new and barrier-free built with flat ramps instead of stairs. Until the completion of the overall project at the end of 2020 rehabilitation work will be carried out in the section of the Donaulnde Railway between the Edelsinn Bridge and Stber-Gunther-Gasse.

🔍 Key Information

📄
Tender Reference No.
448829398
📅
Publication Date
14 Nov 2019
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Austria

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 14 Nov 2019
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Austria
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…