📋 Tender Overview
The bridge over the Mistelgraben on the L 4173 state road in the municipality of Schwarzau im Gebirge Neunkirchen district was rebuilt. The total construction costs of around 210000 euros will be borne entirely by the state of Lower Austria. To ensure that the construction of the new bridge ran smoothly the traffic was routed over a replacement bridge which was built in advance by the Neunkirchen bridge maintenance department.The bridge was built with a clear width of 5.4 meters a lane width of six meters and narrow edge beams of 80 centimeters. The work was started by the Swietelsky company on June 28th. Finally the replacement bridge was dismantled by the bridge maintenance department in Neunkirchen.The construction project became necessary because the bridge over the Mistelgraben was recently in poor condition due to its age. For this reason the Lower Austrian Road Service decided to rebuild the bridge object.