π Tender Overview
Road Administration and Road Construction will begin local, permanent repair work on the roadway in sections of Weissgerberlande and Erdberger Lande after excavations by installation departments and due to damage caused by time.
Details and traffic measures
Intersection plateau Weissgerberlande/Rasumofskygasse from October 28th to November 18th. Two lanes will be maintained in Weissgerberlande during the construction period. Turning right into Rasumofskygasse is not possible. The diversion takes place via Paracelsusgasse, Untere Weissgerberstrasse, Blutengasse and Lowengasse. The Lowengasse tram stop on line 1 in the direction of travel towards the city will be temporarily relocated to Lowengasse in front of house number 47 for the duration of the construction. The Lowengasse bus stop on line 4A in the direction of travel towards the city will be closed without replacement for the duration of the construction period.
Weissgerberlande between Untere Viaduktgasse and Krieglergasse from October 29th to November 3rd. One lane will be kept free for traffic during the construction period.
Erdberger Lande after the intersection with Lechnerstrasse from October 29th to October 31st. One lane will be kept free for traffic during the construction period.