📋 Tender Overview
In order to create more green space and to continue to improve climate protection, the City of Vienna - Road Administration and Road Construction will begin road construction work on Springergasse in the section between Darwingasse and Muhlfeldgasse in the 2nd district on Monday, September 30, 2024 as part of roadway renovation work.
Details
Due to damage caused by time, the roadway of Springergasse between Darwingasse and Muhlfeldgasse is being renovated. As part of this work, this section will be redesigned to be climate-friendly. To create a pleasant microclimate, a total of eight green spaces will be created on the side of the even house numbers in Springergasse, which will be planted with a total of seven trees and a standard shrub. Six new seating areas for consumption-free relaxation will be created and a new drinking hydrant will provide cool refreshment in the future. For greater traffic safety, sidewalk extensions will be built at the intersection with Darwingasse.
Traffic measures
Springergasse will be closed to traffic between Darwingasse and Muhlfeldgasse for the duration of the construction work. Access to the approved parking spaces is possible. Pedestrian traffic will be maintained.
Further information is available at wien.gv.at/verkehr/strassen and wien.gv.at/verkehr/baustellen or by calling +43 1 955 59 - Infoline Street and Traffic.