📋 Tender Overview
The executive has adopted a decision scheduled for 2023. construction of 21 roads for the construction program, 2022 unfinished road maintenance work from 1, 18 roads, and 3 transportation facilities, Financial resources for 21 roadblocks, 2 additional journeys, 4 completed roads, and 5 percent payment (GDP) such as to allow changes to 1 contract. The total length of the renovated highway is 81.0 km, totaling $8,972,683,160.
In particular, there's an 11.5km journey from Ashdod to Bavaria, From the site to the site, 7.5 km (4.5 km) from Zarithap, four miles [8 km] from Goris to Capan, 3.96 km (8.2 km) in Karbi-Ohanavan, 9.5 km (4.2 km) in the Liberation area, upper Ptolney-Falls 2.3km, From the waterfall to the Kharbourd 1.3 km (2.25 km) in the advertising area, 12.3 km (8.4 km) from Charanzavan, and 1.3 km (6.3 km) of Hartavan (crossing the village of Yerevan), Tujur-Nauvoo highway (7nd place - 36 km) A 48-mile [4 km] journey from farmland to Gnishik, 954.14 km (4.11 km) from Tilkar to Mountain range, lower Byzantine Road, 93.75 km (2.7 km) of Kakawadzor highway, Akkalik - 5.76 km (<>.<> km) of Sunrise, <>.<> km (<>.<> km) long, H<> highway Construction of a road leading from <> kilometers to the army. Reconstruction of a collapsed soil pasture in the Eagle section.
Completed in Basum on Vanevor-Tashir highway, Pushkin Tunnel, <>,<> km (<>,<> km) camp - /M-<>/ Republican highway M-<> - <> km (<> km) of doves, H-<>, /H-<>/ - Jerusalem Temple, <>.<> km (<>.<> km) of republican significance road, Mandalay - Arviak - Garden Construction of the <>.<> km (<>.<> km) area of Vardar- Regional Meaning Road.
The following services for the compilation and testing of blueprints will be obtained: improving security elements in the Diligan-Neighborhood and correcting black dots; Vanevor (M-6 crossing point) - Construction of a section of the Sevan-Martoon-Getap highway (Seliem Mountains) in the vicinity of Warwick, Diligan Intercontinental Highway, Construction of a section of Sholakat -Shorja 1.14 km (5.3 km) on M-16 highway, Armenia - Uzbekistan 73.3 km (except for landslides) construction, construction of a 8.<> km (<>.<> km) section of Golden Wade, etc.