Roads and Highways

Argentina Negro Improvement Tender

📄 Tender ID: 488353614 📅 Published: 16 May 2023

📋 Tender Overview

They are divided into three sections and contemplate specific tasks depending on the characteristics and particularities of each section. At the same time Mesh 103 continues to advance which intervenes the entire extension of the RN 151. In addition a tender date has already been set for another intervention on the last 40 km of the route up to the border with La Pampa.The Ministry of Public Works of the Nation through the 20th District of National Roads reports that the tasks of sealing cracks texturing the bearing surface and optimization of shoulders in the first 30 kilometers of the RN 151 are progressing at a good pace.The actions are part of the improvement and maintenance work that takes place between km 3 and 109 of the RN 151. This work contemplates the execution of different tasks depending on the characteristics of each section. Within the planning to intervene in this first sector work has been done on the filling and compaction of bankers the correction of hollowing and the sealing of fissures to later be able to make a new folder that optimizes traffic safety.The project is divided into three sections each with its particularities and specific tasksIn Sector 1 up to km 33 it is planned to carry out the texturing of the existing bearing surface of one hand or in the total width of the road as necessary in each section as well as the sealing of cracks.In Sector 2 up to km 80 the conditioning of specific areas will be carried out by milling the existing asphalt layer. In addition work will be done on the application of a garter irrigation the execution of an asphalt folder in the dimensions that are required milling and texturing for the correction of deformations sealing of cracks and superficial and deep potholes with hot material.In Sector 3 up to km 110 it is planned to mill the road in the total width and the execution of a new hot folder after applying a league irrigation.Tender for the last 40 km of the RN 151As for the road resurfacing project of the last 41 kilometers of National Route 151 in Ro Negro km 109 km 150 to the border with La Pampa it has already been approved by the general administrator of National Roads Gustavo Arrieta and has a public tender date for June 22.The work has an execution period of 12 months from the beginning and it is the most deteriorated section of the route through Ro Negro for which a new construction project was carried out that includes sub-base base repaving signaling among others.Mesh 103On the other hand the 20th Ro Negro District continues to work on the current project of Mesh 103 that covers National Route 151 in all its extension within the province from the intersection with National Route 22 to the border with La Pampa with an estimated investment of 30000 million pesos.To give continuity to the tasks that are being developed and those that will be executed after the award of the work for the last 40 km work is being done on a project with a work contract called C.RE.MA. - Recovery and Maintenance Contract - which consists of an investment in recovery works of 80 of the total amount and another stage maintenance of the route for 72 months.

🔍 Key Information

📄
Tender Reference No.
488353614
📅
Publication Date
16 May 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Argentina

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 May 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Argentina
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…