Roads and Highways

Argentina National Highway Tender

📄 Tender ID: 487124385 📅 Published: 14 Apr 2023

📋 Tender Overview

The Ministry of Public Works through National Roads advances with the works of transformation into highway of national routes 7 and 8 in the province of Buenos Aires. Yesterday the general administrator of the national road agency Gustavo Arrieta together with the deputy general administrator Alejandro Urdampilleta and the executive managers Patricio Garca and Jorge Ruesga toured and supervised the works that are being executed in different sections.We are facing two of the road works that will have the greatest impact in social commercial and productive terms. The transformation of National Route 7 and National Route 8 into highways will improve the integration of the entire northern and northwestern area of the province of Buenos Aires as well as the connection with the main productive regions of Santa Fe Crdoba San Luis Mendoza and the countries that make up Mercosur said Arrieta.He also added We share the conviction of President Alberto Fernndez Vice President Cristina Fernndez de Kirchner and the Minister of Public Works Gabriel Katopodis in relation to this type of works are the engine of growth of this province and the whole country. In addition to contributing significantly to the generation of employment they improve the quality of life of the inhabitants thanks to the increase in road safety from the reduction of frontal accidents.First the officials were present on National Route 7 where the duplication of the road is carried out in the 55-kilometer stretch that extends between Carmen de Areco Km 141 and Chacabuco Km 196. With an investment that exceeds 27 billion work is currently concentrated on the distributor located at the intersection with Provincial Route 31 where soil movements are carried out that include cleaning the land construction of the seating bases special compaction and embankment. In other sectors of the same section the sub grade and the sub base of the road treated with lime are executed and concrete culverts are built.Then they moved to another section of the RN 7 Highway the one corresponding to the Chacabuco Bypass a work of 23 kilometers of extension that begins in the distributor of East Access and ends in the distributor of West Access to that city. With a highway format and five new distributors its function is to avoid the passage of heavy transport through the urban ejido of Chacabuco thus increasing road safety and saving travel times. With a physical advance of more than 70 and an investment of 10900 million by the national government the placement of asphalt base is currently being carried out in different sectors of the trace.Finally in the work of transformation into a highway of the RN 8 the authorities stopped in the area where the new access distributor to the town of Juan Anchorena begun in January is being built. It consists of the execution of a diamond-type intersection with crossing at different levels whose configuration includes two entrance branches two exit branches and bidirectional paved collectors. Currently the embankment and culverts of the distributor bridge are being built. Once completed it will improve the connectivity of those who reside in the town of Urquiza with the highway.This distributor will be located in the party of Pergamino. There and in Arrecifes is also in execution a stretch of 15 kilometers that develops between Todd Km 198.7 and Fontezuela Km 213.7 with a physical progress close to 90. Through an investment of more than 7500 million the asphalt folder is being executed on the main road while soil movement works and construction of special layers are carried out in the Fontezuela distributor as well as slope coating along the entire route.

🔍 Key Information

📄
Tender Reference No.
487124385
📅
Publication Date
14 Apr 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Argentina

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 14 Apr 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Argentina
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…