📋 Tender Overview
The execution of the PIMI consists of clearing snow on the roads, the irrigation of saline solution and all the necessary actions to safeguard road safety on the national routes of Chubut, Mendoza, Neuquén, Río Negro, Santa Cruz and Tierra del Fuego in the winter season.
National Highway reports that, in view of the adverse weather conditions that have occurred, with personnel from the districts of Mendoza, Chubut, Neuquén, Río Negro, Santa Cruz and Tierra del Fuego and their respective camps, actions are being carried out to clear the national routes and provide users with the necessary safety conditions for their circulation.
In this sense, in the points where the snowfall was most intense, such as on the National Route 3 of Chubut, guided caravans were organized to assist the vehicles stranded by the snow. This was possible thanks to the participation of the National Highway Authority, in conjunction with the security forces, which has arranged snow plow trucks that accompany the vehicles to clear the road in real time.
The Comprehensive Winter Maintenance Plan (PIMI) is carried out along more than 7,500 kilometers of national routes and involves 14 international crossings. The development of these tasks is essential to optimize the circulation conditions of all users, strengthens the regional connection and ensures the transit of cargo and passenger vehicles, which enhances economic and tourist development.
To this end, the execution of these tasks has been planned efficiently, optimizing the resources available, both specialized personnel and machinery and all the materials necessary for their development.
International Steps
The Cristo Redentor Pass, on National Route 7, for the moment continues to be closed due to the strong polar wave that affects the entire mountain range.
Currently, the snow clearing and material removal work continues uninterruptedly with the simultaneous use of 9 equipment, including loaders, motor graders, bulldozers and salt distribution trucks. District agents work from Uspallata for more than 70 kilometers in order to achieve passability to the international border.
In the case of the Pehuenche International Pass, on National Route 145, the teams are working in the area from Las Loicas to the border with Chile.
Near the international limit, an accumulation of close to 3 meters of snow is estimated, not counting the avalanches that have deposited amounts on the route that are added to the precipitated ones. To restore its circulation, heavy equipment (bulldozers and motor graders) work to remove snow and dragging material from slopes.
Before starting your trip, check the status of the routes on the National Highway website or contact the User Service Center from Monday to Friday from 9 a.m. to 6 p.m. by calling 0800-222-6272 / 0800-333-0073, or via email at atencionalusuario@vialidad.gob.ar