📋 Tender Overview
The works consist of the horizontal demarcation of the axis and the edges of the road on national routes 40 25 and 3.The Ministry of Public Works through National Roads reports that horizontal demarcation work began on different national routes in the province within the framework of an action that will improve the safety of users who travel through them.In this first stage the demarcation began on National Route 40 between Esquel and Leleque in the sectors where the asphalt folder was recently rebuilt and only had a provisional sign.Later the painting teams will move to the section that goes from the access to the town of Facundo to Los Tamariscos also on the RN 40.Once the work is completed in these sectors the personnel will be installed on National Route 25 to complete the horizontal signaling in the sectors where resurfacing works were carried out between Paso de Indios-Los Altares and Los Altares-Las Plumas.Subsequently they will carry out the same task between Las Plumas and Dolavon and on National Route 3 at the height of Garayalde.These works are carried out with reflective thermoplastic paint with distribution of glass microspheres that accentuate retroreflectivity and ensure better visibility when driving at night or in adverse climates such as rain or snow.National Roads requests to respect the signage in the places where the personnel and equipment are located. In addition it recommends checking the status of the routes which is available at this link.