📋 Tender Overview
The Regional Government of Arequipa, through the Regional Infrastructure Management, made a new technical visit to the construction work of the Virgen de Chapi bridge, on the Arequipa - La Joya regional route, considered a priority infrastructure for the development of the region.
During the day, the technical team supervised the preliminary works to the concrete emptying, which include the cleaning of the surface oxide in the assembly of the reinforcements through sand processes, application of special remover and washed with water. These actions are essential to guarantee the quality, resistance and durability of the structure before starting the next construction stage.
At the same time, land movement and access qualification are executed, indispensable to ensure the operation of the equipment and the correct installation of the concrete pump that will be used in the emptying.
The Regional Government of Arequipa maintains its commitment to a safe, efficient and transparent execution, ensuring that this project, long expected by the population, will strengthen connectivity and directly benefit the families of the jewel and the entire region.