📋 Tender Overview
The regional governor of Arequipa, Dr. Rohel Sanchez Sanchez, carried out an inspection of the work being carried out on the Arequipa - La Joya bridge, verifying that the work is being carried out according to the established schedule and is in its final stage of construction.
During the visit, the pouring of new sections of the bridge structure was verified, leaving only three pending to complete this stage. Subsequently, work corresponding to side walls, asphalt layer, signage and structural resistance tests will be carried out before putting it into operation.
The regional governor reported that, once the emptying work is completed, technical load tests will be carried out to guarantee the safety and operability of the infrastructure.
Likewise, he explained that this important road infrastructure will be integrated with the Arequipa - La Joya and Nueva Molina roads, allowing for improved connectivity and decongestion of vehicular traffic, especially heavy cargo transportation.
For his part, the head of the Regional Investment and Transfer Supervision Office, Sulpicio Choque, pointed out that the technical processes carried out in the metal structure and in the pouring of concrete are constantly being verified, guaranteeing compliance with the specifications established for the work.
The Arequipa - La Joya bridge is one of the most important road projects promoted by the Regional Government of Arequipa, aimed at improving passability and strengthening the connection between Arequipa and the provinces of the region.