📋 Tender Overview
* Execution of the expected project will have a period of 720 calendar days.The Ministry of Transportation and Communications (MTC) through the Special National Transportation Infrastructure Project - (PROVIAS), fulfilling its commitments with the regional and local authorities, leaders of the Pro Asphalt Committee and the population of Huancavelica, delivered the resolution that approves the Technical File for the definitive paving of the Huancavelica - Santa Ines highway, for an amount greater than 528 million soles.
The emotional and perhaps the most anticipated moment of the meeting called by the MTC at the sectors headquarters in Lima, was when the Vice Minister of Transportation delivered the long-awaited document to the regional governor, constituting a fundamental step to enable the execution of the emblematic work that will contribute to closing gaps and improve the quality of life of Huancavelican citizens.
The approval was materialized through Directorial Resolution No. 217-2026-MTC/20, which approves the Definitive Study of the project Improvement of the Huancavelica - Santa Ines Highway - Junction Route 28 A, Via Los Libertadores (Pampano), Section: Huancavelica - Santa Ines.
The Final Study approved by the MTC was prepared by the company HOB CONSULTORES S.A., within the framework of the contract signed with the Regional Government of Huancavelica with the support of Provias Nacional, in accordance with an inter-institutional cooperation agreement.
It consists of 128 volumes that contain the definitive engineering studies, technical specifications, measurements, budgets and other technical documentation necessary to guarantee the viability and quality of the intervention.
According to Article 1 of the resolution, the construction of the 77-kilometer-long national highway will require a budget of 528 million 298 thousand 874.76, with the execution period being 720 calendar days.
The intervention will reduce travel times, improve road safety conditions and boost economic activities in the region, commented the regional governor, mentioning that the approval of the technical file was long awaited by the population that celebrates this new achievement, on the way to the crystallization of the highway megaproject that will link Huancavelica with the coast and the south of the country.
DATA
The final double-lane paving of the Huancavelica - Santa Ines highway, apart from being a socially profitable project for the region and the country, is one of the strategic exit routes to the south and the coast of the country.