📋 Tender Overview
* Final paving and double lane project covers 77.23 kilometers.Another great achievement for Huancavelica After months of patient preparation of the final studies and the tireless efforts of the head of the regional government to prioritize this important national route, the Ministry of Transportation and Communications (MTC), through the Special National Transportation Infrastructure Project - PROVIAS NACIONAL (PVN), approved the Technical File for the asphalting of the Chincha - Palca - Villa Arma - Empalme Route PE-28 D highway; Chincha - Dv section. Huachos, for an amount that exceeds 752 million soles.
Through Directorial Resolution No. 383-2026-MTC/20, dated May 8, 2026, signed by the executive director of PROVIAS NACIONAL, Claudia Liliana Davila Moscoso, the green light was given to this project long awaited by the Huancavelican population, which will see a new path of integration towards the coast of Peru materialized.
The project includes the improvement of approximately 77.23 kilometers between the Ica and Huancavelica regions. The technical file consists of 144 volumes that include traffic studies, georeferencing, topography, geometric design, signage and road safety, geology and geotechnics, hydrology and hydraulics, among other fundamental aspects for a work of this magnitude.
The total investment amounts to 752 million 224 thousand 409.75 soles and the execution period will be 900 calendar days. The road will be double lane with final asphalt, safe, sustainable, inclusive and competitive, oriented towards regional integration and development. It will directly benefit towns such as Aurahua, Villa de Arma and Huachos, in the province of Castrovirreyna, among other districts.
The approval was given after memoranda 1159-2026-MTC/20.8 and 1211-2026-MTC/20.8, Report No. 012-2026-MTC/20.8.2.05 of the Directorate of Studies, and Report No. 510-2026-MTC/20.3 of the Legal Advisory Office, all with opinion favorable.
The head of the regional government expressed his joy and assured that the next step will be to manage and guarantee financing, with the aim of starting the construction of the project this year, 2026. It is another of the most anticipated works for decades by the Huancavelican people, he finally stated.
DATA
The technical file was prepared by the HUACHOS ROAD CONSORTIUM, made up of JNR CONSULTORES S.A. and OBRAS CIVILES CON CALIDAD TOTAL S.A.C., under Contract No. 011-2020-MTC/20.2 of 02/07/2020.