📋 Tender Overview
If weather conditions permit, this Sunday, April 12, piling works will be carried out on Silvio Pettirossi Avenue (route D025), in the Asuncion-Luque direction, as part of the Las Residentas Road Corridor works. The interventions will take place between 07:00 and 15:00. During this time, traffic will be temporarily rerouted approximately 400 meters from the Las Residentas monument, in order to maintain circulation and guarantee the safety of both drivers and personnel on site. In that sense, vehicles leaving Asuncion must circulate on the median and shoulder enabled in that same direction. Drivers are asked to drive with maximum caution, reduce speed and respect the instructions of the flaggers, as well as the installed signage. The operation will be accompanied by the Highway Patrol to organize traffic and reinforce security in the area. The project The execution of these piles constitutes a key stage for the construction of the base of the future viaduct. The Las Residentas Road Corridor contemplates the expansion of the road, along with important hydraulic channeling works to improve the drainage system. The objective is to optimize urban connectivity and provide a more efficient and safe road solution for the area. Citizen attention channel If you have any questions or queries about the progress of the project, the community service line is available: 0985 203 381. The works are carried out by the company Benito Roggio e Hijos S.A., with financing from the Itaipu Technology Park Foundation - Paraguay, under the supervision of the Ministry of Public Works and Communications (MOPC). Date: April 10, 2026