Oil and Gas

Amending Petroleum Law Tender

📄 Tender ID: 534367318 📅 Published: 22 Jun 2026

📋 Tender Overview

According to Dr. Phan Ngoc Trung, former Member of the Board of Directors of Vietnam National Industry and Energy Group (Petrovietnam), Head of the Review Advisory Board of Vietnam Petroleum Association, new points in the draft Petroleum Law 2022 (amended) related to marginal fields and activities to improve oil recovery coefficient not only remove practical problems but also create new motivation to maintain domestic oil and gas exploitation output. Download Dr. Phan Ngoc Trung: The Draft Petroleum Law 2022 (amended) needs to continue to be optimized to promote search and exploration activities using science and technology, enhance the application of solutions to improve oil recovery efficiency, develop marginal fields, thereby paving the way for the oil and gas industry to continue to lead and shape the national geo-energy future. Resolution 70-NQ/TW of the Politburo identifies ensuring energy security as a strategic task, in Oil and gas continues to play a particularly important role in primary energy supply for the budget and macroeconomic balance. Search, exploration and exploitation (E&P) activities are the foundation that determines the level of national energy autonomy. Vietnams oil and gas industry is currently facing a big challenge when most of the key fields have been exploited for a long time. Many mines record natural production declines of 15-30% per year. Meanwhile, new discoveries are increasingly rare, mining conditions are complex and investment costs are higher, specific technical requirements and flexible PSC mechanisms are required. In the context of the decline of large mines, promoting E&P at small and marginal mines is an urgent requirement to maintain output and increase reserves. Although the scale of each mine is small and its life cycle is short, the total cumulative potential is very significant, creating a solid buffer zone during the energy transition period. In addition, connecting to existing infrastructure (FPSO, pipeline) helps reduce investment costs (CAPEX). According to Dr. Phan Ngoc Trung, although the 2022 Petroleum Law has many important innovations, practical implementation shows that some regulations on investment incentives have not really been as effective as expected. One of the major shortcomings is the determination of marginal mines based on the internal rate of return (IRR) target of less than 10%. This is an index strongly affected by oil price fluctuations and investment costs, making it difficult to identify beneficiaries of incentives. In addition, for projects applying technology to improve oil recovery coefficient, the new Petroleum Law 2022 stops at a general incentive policy without a specific incentive mechanism. This reduces the incentive to invest in advanced technology solutions, which require large capital, long recovery times and potential technical risks. In the context of aging fields, if there is not an attractive enough mechanism to encourage additional investment, it will be very difficult to fully exploit the remaining oil and gas in the ground. To free up resources, Dr. Phan Ngoc Trung proposed 4 breakthrough solutions: Completing the preferential and flexible PSC mechanism and shortening the approval process for small mines; Promote the common infrastructure connection model to optimize operating costs (OPEX); Attracting international contractors with complex geological experience; Applying digital technology and solutions to enhance oil recovery (IOR/EOR). These points have been specified in the draft Petroleum Law 2022 (amended). Dr. Phan Ngoc Trung said that the draft clarifies the concept of marginal oil and gas fields and designs a separate preferential policy framework for this type of project. Accordingly, marginal mines are defined as mines with investment efficiency approaching the minimum threshold under normal economic and technical conditions. These are mines that, if the current mechanism is applied, will be very difficult to attract investors to develop. To solve this problem, the draft Law offers many breakthrough incentives. Regarding tax policy, the contractor is entitled to apply a corporate income tax rate of 25% along with a crude oil export tax rate of only 5% and a maximum cost recovery rate of 80% of the oil and gas output exploited in the year. Regarding the financial mechanism, the draft allows to increase cost recovery by a maximum of 10% compared to existing oil and gas contracts. This is an important factor that helps improve investment efficiency for small-scale projects or complex mining conditions. In particular, after completing the natural resources tax obligation, the contractor can use the entire oil and gas profit to recover costs and can enjoy the entire remaining oil and gas profit under a special incentive mechanism, from the time the field development plan is approved and export tax obligations (if any) are fulfilled. These policies will contribute to creating conditions for mines that were previously ineligible to develop into economically effective projects, thereby avoiding wasting remaining resources in areas that already have existing mining infrastructure. This is an approach consistent with international practice, on the basis of harmonizing the interests of the State and investors, in order to maximize the exploitation of resources, Dr. Phan Ngoc Trung commented. Download New policies in the draft Petroleum Law 2022 (amended) will contribute to creating conditions for fields that were previously ineligibledevelop into economically effective projects, thereby avoiding wasting remaining resources in areas with existing exploitation infrastructure. Creating new motivation for activities to improve oil recovery coefficient. Along with policies for marginal fields, the draft Law also pays special attention to activities to improve oil recovery coefficient (Enhanced Oil Recovery - EOR). According to Dr. Phan Ngoc Trung, the authorities need to develop a method to accurately

🔍 Key Information

📄
Tender Reference No.
534367318
📅
Publication Date
22 Jun 2026
🌐
Sector
Oil and Gas
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 28 Jun 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…