📋 Tender Overview
During the week of January 9 to 15, the Ministry of Public Works and Communications (MOPC) carried out maintenance work on local roads in the department of Itapua, reaching a total of 11 interventions in six municipalities, with a cumulative production of almost 100 kilometers of improved sections. The tasks, which were carried out through District No. 7, directly benefited more than 2,600 inhabitants, contributing to the strengthening of road connectivity and better access to basic services, educational institutions and productive activities, especially in rural areas with high agricultural circulation. Interventions by operational fronts The work was verified on three operational fronts: Edelira, Trinidad and Carlos Antonio Lopez. In the Edelira section, interventions were carried out in the districts of Natalio, Alto Vera and Edelira, with platform profiling work, surface coating with gravel and mechanized cutting of vegetation, in strategic sections that connect settlements and rural lines. In the Trinidad section, interventions were carried out in Hohenau, Trinidad and Jesus de Tavarangue, where, in addition to road profiling, ditch cleaning and shaping, road clearing and material hauling were carried out, fundamental actions to improve drainage and prolong the useful life of the roads. For its part, in the Carlos Antonio Lopez district, four consecutive interventions were carried out in different access sections to Puerto Lopez and surrounding neighborhoods, with platform profiling work, optimizing walkability in corridors used daily by the local population. These actions are part of the MOPCs permanent road maintenance plan, aimed at guaranteeing roads in better conditions throughout the year, prioritizing sectors with the greatest social and productive impact, and reaffirming the institutional commitment to the development of road infrastructure in the interior of the country. Date: January 19, 2026