Railways

Adif Adjudicates Railway Tender

📄 Tender ID: 519855708 📅 Published: 01 Jul 2025

📋 Tender Overview

The action includes the replacement of deviations and the renewal of roads in both stations in order to increase the reliability of the infrastructure and improve the passage times The deviations are fundamental elements in the railway infrastructure, since they allow to fork a route in two others and are necessary for the correct rowing of the adif trains has awarded, for 7.3 million euros, the contract for the contract for the replacement of the replacement Railways and road renewal in the Pizarra and Aljaima stations, located in the C-2 line of near Malaga. This action will mean the replacement of current deviations (type A) with deviations of greater performance (type P1 and C1), which will increase the reliability of the service and improve the times of passing through both stations. The project also includes the renewal of roads and a series of modifications in the contact airline and safety facilities. The deviations are fundamental elements in the railway infrastructure, since they allow for a way in two others and are necessary for the correct rowing of the trains. Among the main performances at each station include: Pizarra Station: Balasto Renewal and Traviesas on Roads 2 and 4. Ballast renewal, naughty and lane on access to the electrical substation. Levante of 6 deviations and replacement of 5 of them. Aljaima Station: Levante and replacement of 6 deviations. Balasto renovation, naughty and lane on tracks 3 and 4. New seat layer at certain points. These works require a series of modifications in the contact line of both stations: raising posts and porches. Assembly of brackets and compensation equipment, air needles and grounding. Various actions in catenary (correction of decentralization and geometry, etc.) replacement of secondary road catenary. Ripped and rendered catenary in general. In the same way they include changes in security facilities: modification and adaptation of the Electronic Pizarra and Aljaima Electrical interlocking. New supply, installation and commissioning of electrohydraulic needle drives. Supply and installation of new main and secondary wiring. Adjustment of track circuits. Engineering and Validation and Functional Verification tests of the new facilities. The contract for the execution of the works includes the supply of a large part of the road materials (ballast, naughty, lane, mixed coupons), being in charge of Adif the supply of the deviations. These works contribute to the achievement of the Sustainable Development Objective (SDGs) number 9, which has among its goals develop reliable, sustainable and quality infrastructure. European funds This action will have European financing through the recovery, transformation and resilience plan. Financed by the European Union - Nextnerationu.

🔍 Key Information

📄
Tender Reference No.
519855708
📅
Publication Date
01 Jul 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Spain

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 01 Jul 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Spain
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…