Contract Awarded for operation and maintenance of the 65km 11-station Adly Mansour 10th of RamadanNew Administrative Capital NAC line. The contract will run until 2036 and includes an option for a five-year extension until 2041. RATP Dev was previously awarded a separate 15-year contract by NAT to operate and maintain Cairo Metro Line 3 in September 2020. The line which is split into two phases is due to be commissioned in the fourth quarter of this year. The line will run east from an interchange with Cairo Metro Line 3 at Adly Mansour station in Al Salam City along the Ismailia Highway through Shorouk New Heliopolis City Badr City and Robaikey from where it continues south to the NAC. A branch east of Badr will serve 10th of Ramadan City.The planned Phase 3 will extend the line to 90km running from the NAC south via the State Strategic Command Centre Olympic Games City to a new interchange with the planned Alamein City Ain Sokhna high-speed line.The line is being built by a consortium of China Railway Group and Avic International under a US 1.24bn contract awarded in August 2017. A joint venture of TSO and Orascom Construction is responsible for tracklaying under a US 112.5m sub-contract while CRRC Qingdao Sifang is supplying a fleet of 22 120 kmh six-car EMUs for the line. RATP Dev Mobility Cairo plans to recruit a minimum of 90 Egyptian employees to operate the line. Some staff training will take place abroad as well as at a new training centre that RATP Dev will create in Cairo.
π Key Information
π
Tender Reference No.
461048036
π
Publication Date
20 Mar 2021
π°
Estimated Value
N/A
π
Sector
Railways
π
Deadline
31 Mar 2035
π
Notice Type
Contract Awards
π
Location
Egypt
π
Contract Duration
14 Years 11 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.