📋 Tender Overview
Earth Work in Excavation in Foundation Trenches Or Drains (not Exceeding 1.5 M in Width Or 10 Sqm on Plan) Including Dressing of Sides and Ramming of Bottoms, Lift Upto 1.5 M. Including Getting Out the Excavated Soil and Disposal of Surplus. Supplying and Filling in Plinth with Local Sand and Under Floors Including, Watering, Ramming Consolidating and Dressing Complete. Providing Designation 100a One Brick Flat Soling Joints Filled with Local Sand Including Cost of Watering, Taxes, Royalty All Complete as Per Building Specification and Direction of E/i. Providing and Laying in Position Cement Concrete of Specified Grade Excluding the Cost of Centring and Shuttering - All Work Upto Plinth Level. Brick Work with Bricks of Class Designation 100a in Foundations and Plinth in Cement Mortar. 12 Mm Cement Plaster Finished with a Floating Coat of Near Cement. Reinforced Cement Concrete Work in Wall Including Attached Pilasters, Buttresses, Plinth and String Courses, Fillets, Columns, Pillars, Piers, Abutments, Posts and Struts, Etc. Up to Floor Five Level Excluding Cost of Centring, Shuttering, Finishing and Reinforcement. Providing and Fixing M.s. Grills of Required Pattern in Frames of Windows Etc. with M.s. Flats, Square Or Round Bars Etc. Including Priming Coat with Approved Steel Primer All Complete. Providing Corrugated G.s. Sheet Roofing Including Vertical / Curved Surface. Providing and Fixing 1st Quality Ceramic Glazed Wall Tiles Conforming to Is: 15622 in Skirting, Risers of Steps and Dados Over 12 Mm Thick Bed of Cement Mortar. Earth Work, Cement Concrete, Brick Work, Cement Plaster, Reinforced Cement Concrete, M.s. Grills, G.s. Sheet Roofing, Ceramic Glazed Wall Tiles