📋 Tender Overview
Construction of shed near st.anthony chapel at fucro mondo in v.p. benaulim of benaulim constituency, construction of shed near st.anthony chapel at fucro mondo in v.p. benaulim of benaulim constituency, steel work in built up tubular (round, square or rectangular hollow tubes etc.) (square hollow section (shs) is4923 /rectangular hollow section (rhs) is4923/ circular hollow section (chs) is1161 closed structural steel of (sail, tata. vizag, jsw ,apollo steel ltd.) make (min yeild stress 310 mpa)) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete, add for providing & fixing flashings -[corners, ridges, valleys, gable end & trims] (girth upto 610mm) including all the accessories complete as per the directions of the engineer in charge, providing and fixing colouron plus galvulium roofing sheets of 0.45mm thick double ribbed trapezoidal profile coated 1080mm with cover width of 1020mm including all the accessories (jsw or equivalent make ) but excluding the cost of purlins, rafters, trusses, flashings etc. complete as per the directions of the engineer in charge, providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: all works upto plinth level, earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. (a) all kinds of soil, painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade, rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete, providing and fixing 'name plate or plaque of granite stone slab 20mm thick, black colour with engraving of letters (big and small) in golden colours including bordering etc as directed by engineer in charge