📋 Tender Overview
Contract awarded for Water restoration ahr, subproject alt380 hönningen-liers construction section 01 hönningen local situation lot-0001, title: alt380_ba01 hönningen, profiling water corridor, description: the ahrweiler district intends to partially widen the riverbed of the ahr in the municipality of hönningen as part of a river restoration project and to ecologically enhance it. in this context, the main excavation for widening the river flow profile will be carried out in the sub-section alt380 - locality hönningen (ba 01), followed by the ecological enhancement of the water body and the bank areas. the ba01 is located between the kapellenstraße bridge and the currently under-construction hönningen bridge in the downstream area (see attached site plan). the total length of the waterway section to be constructed is approximately 1,100 m. parallel to this ba01, ba03 will also be executed in the locality of liers. if a bidder considers submitting an offer for this section as well, it should be noted that both sections must be executed overlapping/parallel. pre- or post-processing is not permitted. the performance components of the tender include the following contents: - preliminary removal of the topsoil including vegetation layer - accompanying the construction measure by a fire worker as a subcontractor of the main contractor - layer-wise removal of the banks or foreland areas adjacent to the water - removal of any obstacles in the ground if necessary (foundations, old utilities, etc.) - establishment of access routes for carrying out earthworks/water construction works - maintenance of the construction material or soil storage - pure separation and interim storage of the excavated material in the construction site - sampling and analysis of the stockpiles located at the central soil storage - recording and transport of the stockpiles to a recycling facility - documentation of recycling/disposal - profiling of the bank areas - partial installation of slope or bank stabilization. estimated value excluding vat: 3372350.01 eur.Water restoration ahr, subproject alt380 hönningen-liers construction section 01 hönningen local situation