📋 Tender Overview
Contract awarded for tilt construction (the crossbeam bridge of the road v1277 slow-alši 6.50 km, the row bridge of the road v1315 pope-rednieki 3.85 km and the barta bridge of the road p113 grobina – barta – rucava 27.20 km) (3 contracts) tilt construction (the crossbeam bridge of the road v1277 slow-alši 6.50 km, the row bridge of the road v1315 pope-rednieki 3.85 km and the barta bridge of the road p113 grobina – barta – rucava 27.20 km) (3 contracts) Value of the result: Winner selection date : 20/01/2026 Date of conclusion of the contract :12/02/2026 Estimated value excluding VAT :.tilt construction (the crossbeam bridge of the road v1277 slow-alši 6.50 km, the row bridge of the road v1315 pope-rednieki 3.85 km and the barta bridge of the road p113 grobina – barta – rucava 27.20 km) (3 contracts)