📋 Tender Overview
Contract awarded for Structural planning for the main bridge cycle path lot-0000, title: structural planning for main bridge cycle path, description: the municipality of himmelkron intends to implement the project "main bridge cycle path himmelkron." the subject of the project is the construction of a cycle path approximately 790 m long on the former railway line southwest of the town center of himmelkron. the project serves to close gaps in the existing cycle path network between the state road himmelkron-trebgast and the gv road himmelkron-lanzendorf, as well as to improve traffic safety and the attractiveness of the regional cycle path network. as part of the project, three existing bridge structures are to be adapted and strengthened: • flood bridge km 4.828 (approx. 45 linear meters) • flood bridge km 4.94 (approx. 25 linear meters) • bridge white main km 5.156 (approx. 30 linear meters) the construction plans are attached as annexes 27 to 29. the existing documents are to be reviewed by the contractor and used as the basis for the structural planning. if the existing documents are insufficient for individual proofs, the contractor must promptly inform the client of the need for additional investigations or measurements. performance phases 1 to 4 of the object planning for the overall project have already been provided by another contractor. the existing design and approval planning is to be taken over by the structural planner, professionally reviewed, and compared with their own specialist planning. recognizable contradictions, missing foundations, or necessary adjustments must be communicated to the client and the object planner promptly in writing. the subject of the open procedure is the specialist planning of structural planning according to §§ 49 to 52 hoai in conjunction with annex 14 hoai for the three aforementioned bridge structures. the basic services of performance phases 2 to 6 are being tendered. performance phase 1 of the structural planning is not separately commissioned, as it is included in the performance profile of engineering structures for traffic facilities according to § 51 paragraph 5 sentence 2 hoai. the construction costs (as of cost calculation 24.09.2025) amount to approximately €2.16 million gross. for the structural planning, the costs attributable according to § 50 hoai for the individual bridge structures are decisive. these amount to: - flood bridge km 4.828 (approx. 45 linear meters) €344,911.76 - flood bridge km 4.94 (approx. 25 linear meters) €216,000.00 - bridge white main km 5.156 (approx. 30 linear meters) €193,500.00 estimated value excluding vat: 41575.42 eur.Structural planning for the main bridge cycle path