📋 Tender Overview
Contract awarded for Gs steinhude - renovation/conversion to a full-day school - building automation { "detected_language": "german", "translated_text": "lot-0001, title: building automation 1st construction phase, description: the city of wunstorf plans the extension and renovation of the steinhude primary school into a full-day school. the existing school buildings will be converted for full-day use and expanded with new wooden constructions. the construction work will take place in staggered phases. the new buildings will house classrooms, a connecting corridor (1st construction phase), as well as the foyer and a dining hall (2nd construction phase). the existing buildings will be converted for full-day use (2nd + 3rd construction phase). before the new construction begins, parts of the existing building stock will be demolished in two phases. in the first phase, the existing gymnasium and associated ancillary rooms will be demolished to clear the construction site for the 1st construction phase. after the completion of the 1st construction phase, a connecting corridor and an extension (classroom and restroom facilities) will be demolished to clear the construction site for the 2nd construction phase. for the extension and renovation of the steinhude primary school, unter den hestern 3, 31515 wunstorf, the building automation will be expanded in phases. the newly modernized building areas will be gradually integrated into the building automation until the entire building is fully integrated into the existing automation and control technology. knx is planned as the standard protocol for building automation. data points from adjacent trades (including electrical as well as heating/ventilation/sanitary) will be integrated into the knx system via suitable interfaces/gateways according to the respective device types and subsequently handed over to the existing mbe. functionality of building automation the building automation takes over the control, monitoring, and reporting of the connected systems. the functionality includes in particular: room automation / room control: capturing and regulating room parameters, controlling heating valves, and implementing defined operating modes. supply temperature control: operational or weather-dependent control of supply temperatures (according to system structure). window ventilation including night cooling: control/monitoring of window ventilation for night cooling according to release conditions. monitoring and control of ventilation systems: capturing operational states, fault messages, and measurement values of the ventilation systems (including cafeteria/kitchen) and handing over to the mbe. shutdown in case of fire. monitoring of electrical systems: capturing relevant operational and fault signals as well as selected measurement data for operator information. operating modes include school hours, holiday operation, and night reduction. meters from the electrical trade will be integrated via an m-bus interface and made available in the mbe for the representation and evaluation of energy and consumption data. lot-0002, title: building automation 2nd construction phase, description: the city of wunstorf plans the extension and renovation of the steinhude primary school into a full-day school. the existing school buildings will be converted for full-day use and expanded with new wooden constructions. the construction work will take place in staggered phases. the new buildings will house classrooms, a connecting corridor (1st construction phase), as well as the foyer and a dining hall (2nd construction phase). the existing buildings will be converted for full-day use (2nd + 3rd construction phase). before the new construction begins, parts of the existing building stock will be demolished in two phases. in the first phase, the existing gymnasium and associated ancillary rooms will be demolished to clear the construction site for the 1st construction phase. after the completion of the 1st construction phase, a connecting corridor and an extension (classroom and restroom facilities) will be demolished to clear the construction site for the 2nd construction phase. for the extension and renovation of the steinhude primary school, unter den hestern 3, 31515 wunstorf, the building automation will be expanded in phases. the newly modernized building areas will be gradually integrated into the building automation until the entire building is fully integrated into the existing automation and control technology. knx is planned as the standard protocol for building automation. data points from adjacent trades (including electrical as well as heating/ventilation/sanitary) will be integrated into the knx system via suitable interfaces/gateways according to the respective device types and subsequently handed over to the existing mbe. functionality of building automation the building automation takes over the control, monitoring, and reporting of the connected systems. the functionality includes in particular: room automation / room control: capturing and regulating room parameters, controlling heating valves, and implementing defined operating modes. supply temperature control: operational or weather-dependent control of supply temperatures (according to system structure). window ventilation including night cooling: control/monitoring of window ventilation for night cooling according to release conditions. monitoring and control of ventilation systems: capturing operational states, fault messages, and measurement values of the ventilation systems (including cafeteria/kitchen) and handing over to the mbe. shutdown in case of fire. monitoring of electrical systems: capturing relevant operational and fault signals as well as selected measurement data for operator information. operating modes include school hours, holiday operation, and night reduction. meters from the electrical trade will be integrated via an m-bus interface and made available in the mbe for the representation and evaluation of energy and consumption data. lot-0003, title: building automation 3rd construction phase, description: the city of wunstorf plans the extension and renovation of the steinhude primary school into a full-day school. the existing school buildings will be converted for full-day use and expanded with new wooden constructions. the construction work will take place in staggered phases. the new buildings will house classrooms, a connecting corridor (1st construction phase), as well as the foyer and a dining hall (2nd construction phase). the existing buildings will be converted for full-day use (2nd + 3rd estimated value excluding vat: 368502.71 eur.Gs steinhude - renovation/conversion to a full-day school - building automation