📋 Tender Overview
Contract awarded for Soil investigations and control checks - framework contract 2027 lot-0001, title: lot 1: soil investigations and control checks northern urban area (north of the a40), description: the framework contract for soil investigations and control checks in road and underground construction is divided into 2 lots: - lot 1: northern urban area (north of the a40) - lot 2: southern urban area (south of the a40) project-related individual orders will be issued as needed. the most economical bidder has no claim to the awarding of contracts in the amount of their total offer. the annual turnover depends on the scope of the required services. in recent years, an average of about 80 preliminary investigations and about 50 control checks for road construction measures have been carried out annually throughout the urban area. the quantities set are based on non-binding forecasts and may be exceeded or undershot depending on demand. in the event of undershooting the advertised quantities, there is no claim for damages or price increases. if necessary, additional services of up to 50% of the bid amount must be provided based on the contract prices, as long as the contractual term of the contract has not yet ended. the contract is scheduled to begin on january 1, 2027. the contract has a term until december 31, 2027. the client has the right to extend the contract for another year under the previous conditions. the contract automatically extends for another 12 months if the client does not terminate it at least 3 months before the end of the first 12 months, even without stating reasons. the execution of the control checks may only be carried out by testing institutes that are approved according to rap-stra. the contractor must ensure that the sample material taken during the field investigations is promptly handed over to the testing laboratory commissioned by them for analysis. the laboratory designated by the contractor must ensure that the laboratory investigations to be carried out can be conducted as quickly as possible so that the times agreed in advance with the client and contractually stipulated until the submission of the laboratory report are adhered to. lot-0002, title: lot 2: soil investigations and control checks southern urban area (south of the a40), description: the framework contract for soil investigations and control checks in road and underground construction is divided into 2 lots: - lot 1: northern urban area (north of the a40) - lot 2: southern urban area (south of the a40) project-related individual orders will be issued as needed. the most economical bidder has no claim to the awarding of contracts in the amount of their total offer. the annual turnover depends on the scope of the required services. in recent years, an average of about 80 preliminary investigations and about 50 control checks for road construction measures have been carried out annually throughout the urban area. the quantities set are based on non-binding forecasts and may be exceeded or undershot depending on demand. in the event of undershooting the advertised quantities, there is no claim for damages or price increases. if necessary, additional services of up to 50% of the bid amount must be provided based on the contract prices, as long as the contractual term of the contract has not yet ended. the contract is scheduled to begin on january 1, 2027. the contract has a term until december 31, 2027. the client has the right to extend the contract for another year under the previous conditions. the contract automatically extends for another 12 months if the client does not terminate it at least 3 months before the end of the first 12 months, even without stating reasons. the execution of the control checks may only be carried out by testing institutes that are approved according to rap-stra. the contractor must ensure that the sample material taken during the field investigations is promptly handed over to the testing laboratory commissioned by them for analysis. the laboratory designated by the contractor must ensure that the laboratory investigations to be carried out can be conducted as quickly as possible so that the times agreed in advance with the client and contractually stipulated until the submission of the laboratory report are adhered to. estimated value excluding vat: none .Soil investigations and control checks - framework contract 2027