📋 Tender Overview
Contract awarded for 2. sbss munich, bvb services engineering construction, substructure and superstructure (ioh), construction section 50 (ve780i) lot-0001, title: 2. sbss munich, bvb services in civil engineering, upper construction and high construction (ioh), construction section 50 (ve780i), description: 2nd s-bahn trunk line munich, bvb services in civil engineering, upper construction and high construction (ioh), construction section 50 (ve780i) the 2nd s-bahn trunk line munich is being built in partial parallel alignment north of the existing s-bahn trunk line between bf munich-laim and bf munich leuchtenbergring. the underground tunnel consists of two traffic tunnel tubes, a exploratory and rescue tunnel, as well as numerous ancillary facilities. the relevant bvb services refer to construction section 50 (ba 50). this includes the tunnel from marienhof (hp mmho) to the ramp/distribution structure east of berg-am-laim-straße (bal) as well as the construction of the new underground station ostbahnhof (hp mopt). estimated value excluding vat: none .2. sbss munich, bvb services engineering construction, substructure and superstructure (ioh), construction section 50 (ve780i)