📋 Tender Overview
Contract awarded for Replacement of fibre channel (fc) switches lot-0001, title: replacement of fibre channel (fc) san switches, description: the subject of the contract is the acquisition of 4 pcs of fc switch - director 64gfc including sfp modules for two data centers, including installation and ensuring manufacturer support (maintenance) for 1 year. the ministry of labor and social affairs operates information systems in its data centers according to the relevant legislation. this involves a number of applications and software that, by their nature and in connection with the classification of information systems of public administration, constitute elements of the state's critical infrastructure. these systems, in connection with legal measures and personal data protection, require hardware resources operated in the mentioned data centers of the ministry of labor and social affairs. given the dynamic development of applications and the need for rapid allocation of hardware resources, the contracting authority has decided to adapt the way of securing these hardware resources, particularly with regard to the efficiency of the funds spent in both the immediate and long-term horizon, thus ensuring only those hardware resources that are necessary at that moment compared to securing resources with regard to future growth, which cannot be predicted sufficiently in advance. the acquired equipment will ensure their efficient connection. within this technical specification, a generational replacement of fibre channel (fc) san switches for cisco mds technology is requested. the aim of the replacement is primarily to reduce operational risk and costs by utilizing: * simplifying the topology, consolidating and reducing the number and types of switches, * limiting the use of isl links only to inter-site connections, * reducing operational risk by replacing morally outdated hardware, * reducing security risks associated with unsupported software and firmware without the possibility of upgrade, * reducing costs by decreasing the total number of ports in the san by approximately 20% and increasing the utilization of purchased ports (currently about 40% of purchased capacity is unused due to an unconsolidated state), * optimizing operational procedures by deploying modern management and analytical software together with the capabilities of the latest generation hardware such as advanced telemetry and its processing in asic switches, increasing performance by transitioning to 64gfc technology (fibre-channel 64gbps) with investment protection for at least another 7 years of operation, * supporting modern technologies (e.g., nvme). the target san topology consists of two independent fc fabrics stretched between two data centers using cisco cwdm technology. in each data center, there will be exactly one fc switch in each fabric. the participant, in order to verify compliance with the requirements for the subject of performance, will fill out appendix b1 - technical specification of the subject of performance, which will be an annex to the contract in the case of the selected supplier. this public contract is not divided into parts in the sense of § 35 zzvz, respectively § 101 zzvz. the contracting authority has taken this step to assign the above-mentioned subject of performance of the public contract due to the need to ensure unified responsibility in providing comprehensive services. if individual parts of the subject of performance of this public contract were delivered by different entities, the contracting authority would face security risks, organizational risks, and additional costs. for these reasons, the contracting authority does not consider it economical, purposeful, and efficient to divide the public contract into multiple parts. estimated value excluding vat: 35834684.00 czk.Replacement of fibre channel (fc) switches