📋 Tender Overview
Contract awarded for Replacement construction of the sports hall of the wilhelm gymnasium - extended structural work lot-0001, title: replacement construction of the sports hall of the wilhelm gymnasium - additional structural work_ms, description: the services particularly include earthworks, water management, reinforced concrete, prefabricated parts, masonry, and sealing work for the construction of the foundation and the load-bearing structure. also included are underground lines and building penetrations, the grounding system, electrotechnical components, concrete cosmetics, as well as the associated planning, testing, and verification services. scope of services: • earthworks including excavation, leveling, backfilling, and disposal • open water management • underground wastewater, drinking water, and heating lines • floor drains, casing pipes, annular seals, and building penetrations • ring and foundation grounding including potential equalization • clean layers and foundation components • wu floor slab including joint sealing • in-situ concrete and reinforced concrete work • exposed concrete components of class sb 2 • formwork, supporting scaffolds, and temporary supports • concrete steel and concrete steel mats • prefabricated stairs and prefabricated supports • aerated concrete masonry • additional bituminous sealing of the wu floor slab • concrete cosmetics, blasting work, and mineral concrete stains • recycled concrete and qng documentation • empty conduits and installation boxes for electrical engineering • scaffolding, verification, and hourly wage work essential quantities of the construction services to be awarded: earthworks soil loosening and removal approx. 1,089 m³ earthworks leveling approx. 1,425 m² disposal of soil and stones to be reused or disposed of approx. 2,050 t water management open water management 8 weeks standby, 30 days operation drainage wastewater pipes dn 110 to dn 160 approx. 195 m grounding system ring and foundation grounding approx. 1,010 m foundation clean layer of concrete, 10 cm thick approx. 1,216 m² foundation perimeter insulation under the floor slab approx. 1,158 m² reinforced concrete work wu floor slab, 25 cm thick approx. 1,158 m² reinforced concrete work in-situ concrete ceilings including sloped ceilings approx. 1,413 m² reinforced concrete work in-situ concrete walls, predominantly exposed concrete class sb 2 approx. 1,243 m² supporting scaffolds supporting scaffolds for ceilings up to approx. 8.50 m height approx. 1,472 m² reinforcement concrete rebar and concrete steel mats approx. 246 t sustainability surcharge for recycled concrete approx. 350 m³ prefabricated parts reinforced concrete prefabricated stairs 4 pcs. prefabricated parts reinforced concrete prefabricated supports 16 pcs. masonry work aerated concrete masonry approx. 162 m² sealing work sealing of the wu floor slab and wall base approx. 1,277 m² electrical engineering empty and protective conduits in concrete or soil approx. 1,800 m electrical engineering installation and switch junction boxes in concrete approx. 480 pcs. exposed concrete work blasting and mineral stain of exposed concrete surfaces approx. 1,256 m² estimated value excluding vat: 1.00 eur.Replacement construction of the sports hall of the wilhelm gymnasium - extended structural work