📋 Tender Overview
Contract awarded for A 1, replacement construction norderelb bridge - northern substructure, manufacturing supervision steel construction lot-0000, title: a 1, replacement construction of the norderelbbrücke - northern substructure, manufacturing supervision of steel construction, description: manufacturing supervision of steel construction the construction measure essentially includes: the planned construction measure is located in the northern section of the demand plan project for the 8-lane expansion of the a1 starting at the hamburg-southeast motorway interchange to the state border of hamburg/lower saxony. the project sponsor is the federal republic of germany, federal highway administration, represented by the autobahn gmbh des bundes, which is represented by the deutsche einheit fernstraßenplanungs- und -bau gmbh (deges). the construction responsibility lies with the federal republic of germany. the norderelbbrücke (neb) has a prominent position within the vke 714.1. current investigations by the autobahn gmbh show that the structure is in a very critical condition. as a result, heavy traffic can only be conducted over the neb with restrictions. this is already leading to significant impairments and traffic congestion in the area. further construction condition-related restrictions on the currently still available capacities due to additional necessary closures of the structure would have serious consequences, not only regionally in the area of the free and hanseatic city of hamburg. against this background, it was decided to implement the construction of the northern substructure of the neb as a so-called advance case. the planned construction measure aims to ensure a replacement construction in a timely manner. regarding the structure(s) under item 1.2.2, the subject of the service is: the manufacturing supervision in the manufacturing facilities and on the construction site of the steel construction and corrosion protection services including the construction aids according to ztv-ing, part 4, section 1, chap. 7, el. (3) with the associated tests, the examination of the workshop planning / execution planning from a welding and corrosion protection technical perspective, taking into account manufacturing technical aspects, and the support of the client in technical questions regarding the fields of steel construction and corrosion protection. estimated value excluding vat: -1.00 eur.A 1, replacement construction norderelb bridge - northern substructure, manufacturing supervision steel construction