📋 Tender Overview
Contract awarded for Renovation and expansion of the west palatinate clinic at the kirchheimbolanden location - lot 46 - metal construction work (glass doors) lot-0001, title: conversion and expansion of the westpfalz clinic at the kirchheimbolanden site lot 46 - metal construction work (glass doors), description: lot 46 - metal construction work (glass doors) - 6 pcs. 2-leaf aluminum-glass doors t90-rs / ei2 90-s200-c5, with bumpers, in different dimensions, w/h = approx. 1.80-2.00/2.40 m - 1 pc. 1-leaf aluminum-glass door t90-rs / ei2 90-s200-c5, with bumpers, w/h = approx. 2.30/2.40 m - 8 pcs. 2-leaf aluminum-glass doors t30-rs / ei2 30-s200-c5, with bumpers, in different dimensions, w/h = approx. 1.85-2.75/2.30-2.40 m - 16 pcs. 1-leaf aluminum-glass doors t30-rs / ei2 30-s200-c5, partly with bumpers, partly with side panel, in different dimensions, w/h = approx. 1.135-2.20/2.40 m - 1 pc. 1-leaf aluminum sheet panel door t30-rs / ei2 30-s200-c5, w/h = approx. 1.40/2.40 m - 5 pcs. 2-leaf aluminum-glass doors rs / s200-c5, with bumpers, w/h = approx. 2.10/2.40 m - 1 pc. 1-leaf aluminum-glass door rs / s200-c5, w/h = approx. 1.40/2.40 m - 4 pcs. 2-leaf aluminum-glass doors without fire protection requirements, with bumpers, in different dimensions, w/h = approx. 2.20-2.50/2.40 m - 5 pcs. 1-leaf steel sheet doors t90-rs/ ei2 90-s200-c5, w/h= approx. 1.01/2.135 m - 17 pcs. 1-leaf steel sheet doors t30-rs / ei2 30-s200-c5, in different dimensions, w/h= approx. 0.885-1.26/2.135 m, partly additionally with sound insulation requirements - 3 pcs. 1-leaf steel sheet sliding doors without fire protection requirements, w/h= approx. 1.51/2.135 m execution deadlines: start of construction: within 12 working days after receipt of the request from the client (§ 5 para. 2 sentence 2 vob/b); the request is expected to be sent to you by march 22, 2027. completion of construction: within 132 working days after the start of execution. - the above-mentioned contract date refers to the execution on site. the period before that is needed for technical clarification as well as work and assembly planning. - submission of door list as well as work and assembly planning: 40 working days after order placement - completion of steel sheet doors level -1: 30 working days after the start of execution - completion of aluminum frame doors, e+1/+2: 78 working days after the start of execution - completion of aluminum frame doors, e0/ e-1: 132 working days after the start of execution - completion of the commissioning of the doors (drives, hold-open devices, etc.) in the 1st quarter of 2028 within 18 working days, start of execution 12 working days after receipt of the separate request. estimated value excluding vat: 95277.48 eur.Renovation and expansion of the west palatinate clinic at the kirchheimbolanden location - lot 46 - metal construction work (glass doors)