📋 Tender Overview
Contract awarded for Proj. 22.627/1 & 22.627v/1 & tur3015 - merskplas, road and drainage works n132 + koekhoven-north and geheul lot-0001, title: 22627/1 - 1, description: project 22.627/1 & 22.627v/1 & tur3015 - merskplas, road and drainage works n132 + koekhoven-noord and geheul. - performing topographical operations; - conducting a test dewatering; - performing a probe-guided dewatering, return dewatering, monitoring of settlements, placing and measuring of piezometers, sampling of dewatering water; - supplying, placing, using, and removing a water treatment installation for dewatering water; - ensuring the drainage of the existing sewer system and at crossings of watercourses; - clearing trees, shrubs, and hedges and removing roots; - performing trial trenches; - breaking up pipes, inspection pits, road and roadside pavements, masses, linear and local elements (street drains, traffic humps, signage, etc.), stone embankments including foundation and sub-foundation; - selectively milling and removing tar-containing kws pavement; - laying sewers in pp pipes, pvc pipes, unreinforced concrete pipes, reinforced concrete pipes, clay pipes, pipes made of filled and glass fiber reinforced polyester resin and placing inspection pits, access pits and executing house and street drain connections to the sewer and foundation, encasing and backfilling thereof; - performing watertightness tests/air tightness tests of sewers; - performing pressure injections with pressure and reception pits, installation, ...; - laying pressure pipes; - renovation of sewers and extensions of existing culverts; - constructing pump units pu1, pu2, pu3, pd01, pd02, inspection pits d0 and d1, in open excavation; - constructing pump stations ps1, ps2, ps3, ps4, ps5, ps6, ps7, ps8, ps9 in open excavation; - installing a groundwater-tight sheeting for structures and access or connection pits in open excavation; - performing earthworks (for road and drainage works) and soil improvement; - removing surplus soil according to the conditions and guidelines of the temporary operational framework for the use of, if present, pfas-containing soil materials from the moment this becomes applicable; - installing continuous sheeting for construction trenches; - applying soil improvement techniques under foundation starting pipes and structures; - installing wooden piles under foundation starting pipes and structures; - placing gravel cores under foundation starting pipes and structures; - clearing and filling ditches; - constructing ditches including slope and bottom reinforcement; - performing works on watercourses; - constructing bicycle bridges; - constructing end walls in reinforced concrete; - laying a kws pavement road and parking strip on a foundation of lean asphalt and sub-foundation; - laying bicycle paths in asphalt concrete on a stone foundation; - laying footpaths in concrete paving stones on a stone foundation; - constructing edge strips, curb stones, and water ditches on a lean concrete foundation; - placing prefabricated curb stones; - placing street drains; - (re)placing traffic signage; - applying markings; - supplying, placing, relocating, and removing site signage; - supplying, placing, relocating, and removing signage for road diversion; - (carefully) breaking up and (re)placing closures and access gates; - cleaning, purifying, and all necessary operations to bring the works to a state of delivery; - performing planting and sowing works and green maintenance during the warranty period; - performing necessary works during the warranty period. estimated value excluding vat: 16884156.92 eur.Proj. 22.627/1 & 22.627v/1 & tur3015 - merskplas, road and drainage works n132 + koekhoven-north and geheul