📋 Tender Overview
Contract awarded for Preparation of project documentation for the task titled: "expansion of the a4 motorway on the section dulowa junction (without junction) – balice junction and (without junction)" lot-0002, title: development of project documentation for the task entitled: "expansion of the a4 motorway on the section dulowa junction (without junction) – balice i junction (without junction)", description: "development of project documentation for the task entitled: expansion of the a4 motorway on the section dulowa junction (without junction) – balice i junction (without junction), as well as support for the ordering party at the stage of tender(s) for construction works along with providing explanations and answers to bidders and performing author supervision during the execution of works carried out based on the prepared project documentation. the planned investment to be designed includes the reconstruction and expansion of the a4 motorway section approximately 24.0 km long. the beginning of the investment is located at the planned dulowa junction within the construction of the chrzanów and trzebinia bypass, i.e., approximately km 377+120. the end of the existing section is determined at the toll collection point in balice approximately km 401+100. the order includes the development of project documentation in the scope of the conceptual design, construction project, executive project, tender documentation, obtaining all necessary agreements, opinions, notifications, permits, and decisions, including, among others, decisions on environmental conditions, notifications of works, building permits, zrid decisions. the ordered project documentation must be prepared in a manner that allows for its approval by the investment projects evaluation team. the investment will be carried out in two parts: • part i – includes the preparation and implementation of the expansion of the motorway with additional traffic lanes, reconstruction of infrastructure in the area of toll collection points. it is assumed that the works will be carried out within the boundaries of the motorway road strip. • part iib – includes the preparation and expansion of motorway junctions, service areas. the ordering party anticipates the possibility of applying an option. the subject of the order in the optional scope, i.e., in the scope that may be commissioned to the contractor for execution under the right of option, includes: a) geological works project for the preparation of geological-engineering documentation along with its approval b) geological works project for the preparation of hydrogeological documentation along with its approval c) geological-engineering documentation along with approval d) hydrogeological documentation along with approval e) environmental impact report f) tv inspection of the existing stormwater drainage system constituting elements ter – stage ia – for part i and part iib; detailed information regarding the options has been included in the ppu (tom ii swz). estimated value excluding vat: 17343000.00 pln.Preparation of project documentation for the task titled: "expansion of the a4 motorway on the section dulowa junction (without junction) – balice junction and (without junction)"