📋 Tender Overview
Contract awarded for Planning of a waste heat heat pump system in erlangen. lot-0001, title: planning of a waste heat heat pump system in erlangen. description: the erlangen municipal utilities ag intends to commission the planning and construction of a fully automatic waste heat heat pump system, which is to be built south of the planned north bavarian high-performance data center (nhr) on nikolaus-fiebiger-straße in erlangen for continuous operation. the generated heat will be fed into the district heating network of the erlangen municipal utilities. three stages of waste heat expansion of the high-performance data center are planned: stage 1: 2 mwth waste heat (2030) stage 2: 5 mwth (2031) stage 3: 10 mwth (2035) the heat pump system will be designed modularly, so that additional heat pumps can be retrofitted for the aforementioned expansion stages. the waste heat temperature depends on the computer technology used - at the time of ordering - and is to be in the range between 42°c and 50°c. the heat pump system must provide cooling for the data center. the system is to be planned as fully automatic and highly available and is to be primarily operated remotely from the power plant location. estimated value excluding vat: 942303.15 eur.Planning of a waste heat heat pump system in erlangen.