📋 Tender Overview
Contract awarded for Planning services for pipe renovation in occupied residential buildings lot-0000, title: planning services for pipe renovation in occupied residential buildings, description: the services to be awarded concern the integrated provision of all planning services for the construction project by a general planner (hereinafter referred to as an). the aim of the procurement procedure is the early involvement of a capable general planner to develop a technically, organizationally, and economically optimal and fundable overall solution. the subject of the construction project is the renovation of the pipes of the residential buildings paul-junius-straße 36–42 and alfred-jung-straße 16–22 in berlin-lichtenberg in occupied conditions, including the complete renewal of drinking water, hot water, circulation, and wastewater pipes as well as the collection pipes in the basement. in parallel, the structural and technical prerequisites for the implementation of an integrated system for gray water reuse and wastewater heat recovery (iwiq – integrated water and heat recovery in the neighborhood) are to be planned. the construction project will be implemented as a real laboratory within the framework of the research project iwiq. the technical conception, dimensioning, and system planning of the gray water recycling system with integrated heat recovery will be carried out by a specialized planning office already commissioned by the client (nolde) and are not part of the advertised services. the general planner must fully integrate the resulting requirements into their overall planning, coordination, and approval planning and provide all necessary planning services, including interface coordination. the planning of the second pipeline network and all necessary technical building services planning are to be provided by the general planner. all coordination, integration, approval, and planning services required for the planning of the construction project, including the coordination of iwiq-related measures, preparation for implementation, cost allocation regarding funding eligibility, and conceptual preparation of monitoring and operational concepts are part of the general planner's services. all services must be provided with special consideration for execution in occupied conditions, tenant-friendly construction management, and the increased requirements arising from the research and real laboratory character of the project. the services related to the iwiq system are functionally divided into two service modules: (1) planning of the second pipeline network, including all necessary ancillary services, and (2) integration of the gray water recycling system with integrated heat recovery based on the specialized planning provided by the client. this structure serves solely for the technical, calculative, and funding-related delineation of the services and does not justify any division of lots. the commissioning of the an will take place in stages. 1. basic determination, preliminary planning (see lp 1 and 2 hoai) 2. design planning (see lp 3 hoai) 3. approval planning (see lp 4 hoai) 4. execution planning, preparation of the award (see lp 5, 6 hoai) and participation in the award (see lp 7 hoai) 4. management and supervision of construction execution as well as support of the construction project after completion (see lp 8 9 hoai) the ag commissions the an with the planning services: basic determination, preliminary planning until 1/2027. estimated value excluding vat: 1.00 eur.Planning services for pipe renovation in occupied residential buildings