📋 Tender Overview
Contract awarded for From pipeline construction spo los2 middle lot-0001, title: aus_pipeline construction_spo_lot2_middle, description: the following individual services are to be provided for the construction lots, among others: - participation in planning as a consulting service - establishing pipe storage areas and preparing access to them - clearing of vegetation - construction work for laying the pipeline in an open trench including pressure tests and restoration of the terrain including recultivation - construction work for crossing bodies of water - construction work for closed crossings of traffic routes, bodies of water, and railway lines (primarily using the drilling-press method) - crossing the main river using microtunneling (applies to lot 1) - construction work for laying a water pipe 355 pe100 sdr11 (pn16) as a joint crossing of the main with the spo in microtunnel (applies to lot 1) - crossing a biotope and a gravel pit using trenchless hdd method (applies to lot 2) - construction work on steep slopes (partly with existing vineyard walls) - if necessary, restoration of the vineyard walls by a specially qualified, preferably locally based specialist company (applies to lot 3) - installation/laying of the following pipeline accessories: kks system, grounding, kks measuring points, empty cable conduit system for telecommunications line (mostly in the trench) - if necessary, coordination of construction-related ordnance surveying and removal - various services for the implementation of the landscape maintenance accompanying plan (lbp) - supply of small materials for the implementation of the construction measure beyond the provision of the project sponsor. - geometry pigging - implementation of a safety concept / construction watch further information on the subject of the contract will be provided to the applicants selected in the course of the participation competition with the invitation to submit a bid. the following services will not be part of the contract for construction services: - material testing - construction of shut-off valve stations, pigging stations to the existing system of terranets bw - construction of infrastructure connections - archaeological construction supervision and pre-construction excavations - ecological and soil scientific construction supervision - client's construction supervision - construction monitoring and acceptance by experts from tüv süd. estimated value excluding vat: 106658149.83 eur.From pipeline construction spo los2 middle