📋 Tender Overview
Contract awarded for Partial demolition of the brick chimney of savonlinna hospital as a direct procurement lot-0000, title: partial demolition of the savonlinna hospital's brick chimney as a direct procurement, description: the south savo welfare area eloisa is making a direct procurement for the implementation of the partial demolition contract of the savonlinna hospital's brick chimney for the contract period from 01.09.2026 to 15.11.2026. the end date is an estimate that will be refined as the work progresses. a condition inspection was conducted on the brick chimney located in the savonlinna hospital area on june 6-7, 2026. the inspection revealed damage to the brick surfaces on the outside of the chimney, which is why it was decided to investigate the condition of the chimney more closely from the inside with a new study. for further investigations, the chimney was first cleaned from the inside, and the studies were conducted over the entire height of the chimney from june 26 to june 30, 2026. based on the external and internal condition studies performed and laser scanning, it has been determined that especially the structural condition of the upper part of the chimney has deteriorated compared to the inspection conducted in 2024. the goal of the project is to remove the structurally damaged upper part of the chimney in a controlled and safe manner so that the remaining chimney structure remains in as good condition as possible for future investigation, repair, reinforcement, and possible restoration for use. this project does not include the repair or reinforcement of the upper part of the remaining chimney structure after the demolition work, nor the design, structural calculations, manufacturing, or implementation of structures related to the restoration of the chimney for use. the direct procurement will be carried out only to the extent necessary to eliminate safety risks and bring it to a safe condition. the procurement concerns the partial demolition of the damaged upper part of the chimney. an offer has been requested by email, and negotiations have been held with tph fin oy regarding the offer. the estimated total value of the procurement is 334,700.00 euros (vat 0%), exceeding the national threshold value. the subject of the procurement is defined according to cpv code 45220000-5 (works related to structures and technical structures). the contracting entity has the right to make a direct procurement on the following grounds: the act on public procurement and concessions (1397/2016) § 40 direct procurement 4) the conclusion of the contract is absolutely necessary, and the prescribed deadlines cannot be adhered to due to an extreme urgency caused by unforeseen circumstances independent of the contracting entity; in the decision record dated july 1, 2026, the rescue authority states that the chimney of the heating center of the savonlinna hospital poses a clear risk of accident to its environment, which is why, based on the rescue act 379/2011 § 81, the rescue authority orders that the south savo welfare area must immediately take action to bring the chimney to a safe condition. in the interim, before the chimney is brought to a safe condition, a contingency plan must be drawn up on how to act, for example, during a possible storm situation, to ensure personal safety and security in the danger area of a possible chimney collapse. in addition, the south savo welfare area received on july 3, 2026, a directive from the building control authority of the city of savonlinna to take immediate action to ensure the structural safety of the brick chimney located in the hospital area. negotiations have been held regarding the demolition work, and tph fin oy has the opportunity to start the work with the urgency required by the authorities. tph fin oy has special knowledge of the site due to its previous condition assessments, structural inspections, and other investigations related to the chimney. in addition, the company has experience in similar demanding chimney demolition projects. due to the site knowledge and special expertise, the preparation and planning of the execution of the project could be initiated immediately without separate additional investigations or familiarization phases, which also supports the implementation of the safety measures required by the authorities without delay. estimated value excluding vat: 334700.00 eur.Partial demolition of the brick chimney of savonlinna hospital as a direct procurement