📋 Tender Overview
Contract awarded for New construction of identical building bodies to create all-day infrastructure at 4 primary schools: building physics lot-0001, title: nd_new construction of identical building structures to create all-day infrastructure at 4 primary schools: building physics, description: primary school mascheroder holz retemeyerstraße 15 38126 braunschweig primary school hondelage in den heistern 1 38108 braunschweig primary school timmerlah schülerweg 1 38120 braunschweig primary school veltenhof pfälzerstraße 34c 38112 braunschweig the construction measure serves to create the infrastructure for cooperative all-day operation in braunschweig, in order to fulfill the legal entitlement to all-day care starting from the school year 2026/2027 in a grade-wise ascending manner. to carry this out as quickly and economically as possible, the extensions of these four schools are to be carried out with identical building structures. space program the approved space program for the new construction of the buildings attached to the documents takes into account the requirements of the current standard space program (srp) of the city of braunschweig for all-day primary schools. the nuf of the new building amounts to 541 m² per location. this area is oriented to the needs for the all-day operation of a 3-stream primary school according to the srp. in contrast to the identical building corpus, the interior design can be tailored to a certain extent to the individual needs of the schools. in addition, space requirements are considered differently depending on the number of streams according to the srp. to meet the space requirements, the greatest possible overlap regarding the room functions in the four buildings has been taken into account, in order to achieve a high degree of construction uniformity even in the interior design. inclusion/accessibility the city of braunschweig aims to construct new buildings in the sense of inclusion. special attention is paid to the issue of accessibility. the new building must be barrier-free and without thresholds. an elevator is to be planned for wheelchair-accessible access to the upper floors. planning requirements the city of braunschweig aims for sustainable building construction and sustainable building operation combined with co2 neutrality. technical building equipment the partial connection as well as interim solutions to the existing media and technical central units (emergency lighting, it, low voltage, alarm systems) must be taken into account. an alternative examination of separate connections for feasibility and cost-effectiveness is part of the planning, as well as implementation according to the quality manuals. possible on-site appointments for inventory taking should be planned. this also applies to, among others, cost group 550 - technical systems in the outdoor area depending on local conditions based on the soil report and public law requirements. in processing, the planning depths in the individual service phases must be implemented according to vdi 6026. kg 420: all properties in the inventory are heated by gas. it is aimed to operate the new buildings independently of this. building ground a soil report for the respective locations is not yet available. there are relevant information regarding explosive ordnance at the locations. there is a suspicion that explosive ordnance may be present in the ground. for safety reasons, the planned construction area should be surveyed for explosive ordnance before the start of earthworks. timeline the new building at gs mascheroder holz is to be available for the school year 2029/2030. the new buildings at the three other locations for the school year 2030/2031. currently, a possible start of construction is expected in the 2nd quarter of 2027. costs for the overall measure, a rough cost framework for cost groups 200-600 of approximately €17,042,306 net or €20,280,344 gross is currently assumed, which is to be verified in the further process. the cost framework is broken down as follows for the respective locations: estimated value excluding vat: 1.00 eur.New construction of identical building bodies to create all-day infrastructure at 4 primary schools: building physics